Air-Conditioning and Refrigerating Equipment 440.9 Grounding and Bonding Post author:Jake Post published:September 5, 2021 Post category:Code Change of the Week This weeks change is an easy one. If you run conduit on a roof and use compression fittings you will be required to pull an equipment grounding conductor. Till next time be safe work safe. Jake You Might Also Like Available Fault Current May 31, 2014 210.5(C)(1) Exception Branch Circuit Identification when a new voltage system is added to a building. 2017 Code Change September 7, 2020 Single Phase dwelling services March 3, 2024
210.5(C)(1) Exception Branch Circuit Identification when a new voltage system is added to a building. 2017 Code Change September 7, 2020