It has been brought to my attention that FPL is now enforcing a requirement that no bare conductors are allowed inside the meter can. This is noted in their standards under Section VIII, in the final note of that section.
Several installers have mentioned that FPL has accepted heat‑shrink tubing over the bare grounding electrode conductor as an acceptable method of compliance.
Hope this helps.
Be safe, work safe.
Jake
