So you can see it 2011 GFCI new requirements Post author:Jake Post published:April 13, 2014 Post category:Code Change of the Week Post comments:0 Comments You Might Also Like 404.2 Switch Connections. Neutral’s at a switch? NEW TO CODE April 3, 2016 110.21 (B) Field-applied Hazard Markings. September 10, 2016 210.52©(2) Island and Peninsular Countertops and Work Surfaces, (3) Receptacle Outlet Location. September 13, 2026 Leave a ReplyYou must be logged in to post a comment.
210.52©(2) Island and Peninsular Countertops and Work Surfaces, (3) Receptacle Outlet Location. September 13, 2026