This weeks change allows us to use the steel frame of a building in place of running a conductor all around a building. Bonding each item that needs to be bonded into part of the Grounding Electrode system. Such as the case of the electrical service on one side of the building and the cold water service on the other.
Till next time be safe work safe
Jake