In the 2014 NEC they are going to allow us to extend the connection from Grounding Electrode (concrete encased electrode)
into a wall or above grade. In the past we could only have the conductor from the rebar extending out from the concrete
encasement, now we can have the rebar extend out from the encasement for a connection. So this will work when the
town or city will not let you make this connection in the meter can, and you have a main breakers panel as your first means
of disconnect, you bond the neutral to this electrode in the wall near the panel if needed. As you can see in the picture on the
right the connection has to be accessible.
Till next time be safe work safe.
Jake